1-Appliaction:
This machine can go into tinning machine bath for tinning copper wire with max.40 wires.
2-Main Feature:
The tinning furnace is tube type so it is easy to replace and maintenance.
The two ends of the Hot Tinning machine furnace tube all ceramic sleeve design, to prevent the wire be scratched.
3-Parameters:
Machine type |
SY-12H |
Pay-off Stand |
By brush |
Take-up motor |
1.2-1.5N.m |
Transformer |
0.75KW |
No.of wire |
12-40 |
Max.Speed |
100m/min |
Spooler weight |
5-15KG |
Wire dia. |
0.25-0.50 |
Power source |
415V/50HZ/3 PHASE |
4-Advantages:
1.Ironed cast tinning path support long life
2.Measuring temperature by k-type thermocouple,numeric type temperature control meter can adjust the temperature from 0-400ºC automatically.
3.Here are ceramic guide wheel in the middle of tinning bath; guide wheel can rotate 120 degree freely. Wire goes through easily
5-The main scope of supply
1.Pay-off :This part consists of steel stand, aluminum cover, brush and pay off guiding wheels.Pay off aluminum cover can be equipped with different sizes of brushes to match the tensions of different wire diameter. The thickness and density of brush is determined by its process.
2.Tinning part:Tinning channel center has ceramic guiding wheel, the wheel base can turn 120°, easy to thread wire. K type thermocouple measure temperature, digital temperature-controlled meter to control temperature automatic. When Copper Wire Tinning machine working, only need to set the temperature of tinning channel as the technique process, the control meter will control the temperature in certain degree, control rang0-400ºC.
3.Haul off part: This part consists of haul off reel, wire threading guiding wheels, shelf, transmission motor. The haul off device is to haul off copper wire in steady speed to finish the soft tinned copper wire, and control the tension.
4.Take up part : This part is made of take up reel, traversing part, shelf, etc. The take up motor is double instant torque motor, to fit different wire diameter requirement.
5.Electric control part: 3P, 380V power source, electric cabinet control
6-Delivery time: 30-45 working days
7-After-sell service:
Engineer will be dispatched at needed.
The buyer provides engineer's roundtrip flight tickets, board and lodging, the security as well as each person of daily wage.
8-Guarantee: 12 months since shipping date(exclude easily wearing part)